S.N. |
Project Name |
Contract Content |
Capacity |
Type of
Power |
Service
Time |
Evaluation |
1 |
Thar coal-fired power plant, Pakistan |
O&M Guidance |
2×330MW |
CFB |
2019.06-Now |
|
2 |
Salalah Power station, Oman |
Technical Training |
4×75MW+2×90MW |
Gas-steam combined cycle |
2019.5-2019.6 |
Excellent |
3 |
Thar Coal Mining, Pakistan |
Power Supply and Ancillary Facilities O&M |
380 ten thousand ton |
Coal Mining |
2019.01-Now |
|
4 |
Madhumati Heavy Oil Power Plant, Bangladesh |
O&M Guidance |
6×18.8MW |
Heavy oil |
2018.12-Now |
|
5 |
Thar Coal Mining, Pakistan |
Sampling and analysis O&M |
380万吨 |
Coal Mining |
2018.10-Now |
|
6 |
XMC Xinjiang Aksu Thermal Power Co., Ltd. |
Operation and maintenance |
2×200MW |
PCF |
2018.07-Now |
|
7 |
Kalteng Power Station, Indonesia |
O & M, on-job training |
2×100MW |
CFB |
2018.7-Now |
|
8 |
DVC Raghunathpur coal-fired power plant, India |
Operation and maintenance guidance and supervision |
2×600MW |
PCF |
2018.02-2019.2 |
Excellent |
9 |
PAMPA SUL coal-fired power plant, Brazil |
Operation and maintenance guidance and supervision |
1×345MW |
PCF |
2018.02-Now |
|
10 |
Baligian Coal-fired Power Plant, Malaysia |
O & M, on-job training |
2×330MW |
CFB |
2017.03-Now |
Excellent |
11 |
Wasit 1st Phase,2nd Phase Oil(Gas) Power Station, Iraq |
Operation and maintenance guidance and supervision |
4×330MW |
Oil and gas |
2016.12-Now |
Excellent |
12 |
AWAR-AWAR Power Plant, Indonesia |
Operation and maintenance guidance and supervision |
2×350MW |
PCF |
2016.10-2017.11 |
Excellent |
13 |
Singhitarai Power Plant, India |
Manual compilation and O & M guidance |
2×600MW |
PCF |
2016.05-2019.07 |
|
14 |
Sirajganj combined gas and steam turbine cycle Power Plant, Bangladesh |
Operation and maintenance |
225MW |
Gas-steam combined cycle(9E) |
2014.05-Now |
Excellent |
15 |
Barapukuria Coal-fired Thermal Power Plant,Bangladdesh |
Operation and maintenance guidance |
2×125MW |
PCF |
2012.4-Now |
Excellent |
16 |
Mukah Power Generation Sdn. Bhd., Malaysia |
Maintenance guidance |
2×125MW |
PCF |
2012.04-Now |
Excellent |
17 |
Niger State hydropower station Nigeria |
Electrical O& M technical service |
4×175 MW |
hydropower |
2019.08-Now |
|
18 |
Jiangsu Huamei Thermo-Electric 2nd Phase Co., Ltd. |
Long term O&M and major and minor overhaul |
2×350MW |
CFB |
2015.12-Now |
Good |
19 |
Rajiv Gandhi Thermal Power Plant, Haryana, India |
Operation and maintenance guidance |
2×600MW |
PCF |
2015.05-2016.12 |
Excellent |
20 |
Deen Bandhu Chhotu Ram Thermal Power Plant, Haryana, India |
Operation and maintenance guidance |
2×300MW |
PCF |
2015.05-2016.12 |
Excellent |
21 |
Self-using Power Plant of Missan Oil-field, Iraq |
Technical Training、Manual compilation and O & M guidance |
2×44MW |
Gas turbine(SGT800) |
2015.04-2016.12 |
Excellent |
22 |
Labuhan Angin (CFB) Coal Fired Power Plant, Indonesia |
Operation and maintenance guidance |
2×115MW |
CFB |
2014.09-2015.09 |
Excellent |
23 |
Sopladora hydroelectric power plant, Ecuador |
Instrument and meter automation control service |
3×162MW |
Vertical mixed-flow type hydro generator |
2014.07-2016.10 |
Excellent |
24 |
Ningxia East Thermal Power Incorporation |
Unit commissioning and operation guidance |
4×200MW |
Gas-steam combined cycle |
2014.05-2014.10 |
Excellent |
25 |
Self-using Power Plant of Bajel Cement Plant of Yemen Corporation for Cement(YCC) |
Commissioning, operation and maintenance service |
4×200MW |
Gas-steam combined cycle |
2014.05-2014.10 |
Excellent |
26 |
Shandong Yankuang Zhaolou Power Plant |
Commercial operation guidance |
2×300MW |
CFB |
2014.03-2015.03 |
Good |
27 |
Panjiang Power Plant |
Commercial operation guidance |
2×300MW |
CFB |
2013.03-2013.04 |
Good |
28 |
India Salaya Power Plant |
Commissioning |
2×600MW |
PCF |
2011.09-2012.07 |
Excellent |
29 |
Huannan Power Plant |
Commercial operation technical guidance |
2×300MW |
PCF |
2011.12-2012.06 |
Good |
30 |
India Salaya Power Plant |
Commissioning |
2×600MW |
PCF |
2011.09-2012.07 |
Excellent |
31 |
XMC Xinjiang Aksu Thermal Power Co., Ltd. |
Operation and maintenance |
2×220MW |
PCF |
2011.06-2015.09 |
Good |
32 |
Huannan Guqiao Power Plant |
Commercial operation guidance |
2×300MW |
CFB |
2011.02-2012.02 |
Excellent |
33 |
India Orissa Power Plant |
Training, operation and maintenance |
6×135MW |
CFB |
2011.02-2012.02 |
Excellent |
34 |
Sudan Kartoum North Power Plant |
Supervising and instructing the operation, maintenance and handing-over of the generating set |
2×100MW |
Oil-fired boiler |
2010.11-2011.03 |
Excellent |
35 |
Turkey BEKIRLI 1# Power Station |
Supervision and guidance of construction |
1×600MW |
PCF |
2010.09-2012.03 |
Excellent |
36 |
XCMG Comprehensive Utilization Power Plant |
Long term O&M and major and minor overhaul |
2×300MW |
CFB |
2009.08-Now |
Good |
37 |
Tangshan Kailuan Oriental Power Co., Ltd. |
Technical Training |
2×150MW |
CFB |
2007.07-2007.10 |
Good |
38 |
Anping Power Plant of Xiyang Energy Co., Ltd. |
Commercial operation technical guidance |
2×150MW |
CFB |
2007.07-2008.07 |
Good |
39 |
Baoji Beimafang Power Plant |
Supervising and instructing the construction and operation |
2×135MW |
CFB |
2007.10 -2009.05 |
Good |
40 |
Shandong Weishan Power Plant |
Commercial operation technical guidance/td> |
2×12MW |
CFB |
2006.11-2007.04 |
Good |
41 |
Jiangsu Huamei Thermo-Electric 1st Phase Co., Ltd. |
Long term O&M and major and minor overhaul |
2×55MW |
CFB |
2005.12-2005.12 |
Good |
42 |
Shandong Zaozhuang Fuyuan Power Plant |
Commercial operation technical guidance |
1×50 MW |
CFB |
2005.06-2006.06 |
Good |
43 |
Xuzhou Chacheng 1st Phase Electric Power Co., Ltd. |
Long term O&M and major and minor overhaul |
3×55MW |
PCF |
1992.01-2013.12 |
Good |
44 |
Shandong Zaozhuang Fucun Power Plant |
Commercial operation technical guidance |
2×12MW |
CFB |
2003.01-2004.06 |
Good |
45 |
Shandong Bingzhou Power Plant |
Commercial operation technical guidance |
4×12MW |
PCF |
2002.06-2013.12 |
Good |
46 |
Nanhai Garbage Power Plant |
EPC Commercial operation |
400T/D |
Incinerator |
2001.03-2006.10 |
Good |
47 |
Jiangsu Peixian Power Plant |
Commercial operation technical guidance |
3×12MW |
PCF |
2000.06-2000.09 |
Good |
48 |
Shandong Weiqiao Power Plant |
Commercial operation technical guidance |
6×15 MW |
PCF |
1999.12-2003.06 |
Good |
49 |
Shandong Weiqiao Power Plant |
Commercial operation technical guidance |
3×12MW |
PCF |
1999.12-2000.12 |
Good |
50 |
Kuching Power Plant in Malaysia |
Commercial operation |
2×50MW |
PCF |
1996.05-2001.10 |
Excellent |
51 |
Lakhra Power Plant in Pakistan |
Commercial operation |
2×50MW |
CFB |
1993.05-1995.10 |
Good |
52 |
Xuzhou Chacheng 1st Phase Electric Power Co., Ltd. |
Long term O&M and major and minor overhaul |
3×55MW |
PCF |
1992.01-2013.12 |
Good |
53 |
Malaysia Kuching Power Plant |
#4 Turbine & Generator Unit Major Overhaul |
2×50MW |
PCF |
2018.12-2019.1 |
Excellent |
54 |
Vinh Tan Power Plant Phase II, Vietnam |
#2 Boiler Overhaul Guidance |
2×622MW |
PCF |
2018.9-2018.11 |
Excellent |
55 |
Dong Trieu Power Plant, Vietnam |
#2 Turbine & Generator Unit Major Overhaul Guidance |
2×200MW |
PCF |
2018.8-2018.9 |
Excellent |
56 |
Malaysia Kuching Power Plant |
#4 Turbine & Generator Unit Major Overhaul |
2×50MW |
PCF |
2018.12-2019.1 |
Excellent |
57 |
Mukah Power Generation Sdn. Bhd., Malaysia |
Maintenance guidance |
2×135MW |
PCF |
2018.1-Now |
|
58 |
Jiangyin Sulong Heat and Power Generating Co., Ltd. |
Major overhaul |
2×330MW |
PCF |
2016.04-2016.05 |
Good |
59 |
Garri 2×55MW Petroleum Coke Fired Power Plant(Phase 4), Sudan |
Renovation of Boiler Refractory Castables |
2×55MW |
CFB |
2015.05-2015.07 |
Excellent |
60 |
Malaysia Kuching Power Plant |
Major overhaul |
2×50MW |
PCF |
2002.8-2002.10 |
Good |
61 |
Shandong Wu Suo Tun Power Plant |
Unit 2 Overhaul |
3×55MW |
PCF |
1998.07-1998.08 |
Good |
62 |
Mongolian MCS International Co., Ltd. |
Equipment supply |
2×6MW |
CFB |
2012.04 -2012.12 |
Excellent |
63 |
Mongolian UHG Power Plant |
Supervising and instructing the construction、Stack and gas duct construction、Equipment supply、Training、Commissioning |
2×6MW |
CFB |
2010.01-2011.10 |
Excellent |
64 |
Hungary MED Waste Project |
Equipment supply |
100T/D |
Incinerator |
2008.01-2008.09 |
Excellent |
65 |
Uzbekistan Talimarjan Power Station |
Technical support for negotiation on operation, maintenance and Training |
1×150MW |
Gas-steam combined cycle |
2011.12-2012.07 |
Excellent |
66 |
Bosnia-Herzegovina Stanari Power Station |
Technical support for negotiation on operation, maintenance and Training |
1×300MW |
CFB |
2010.12-2011.06 |
Excellent |
67 |
Karaganda No.3 Power Plant of Kazakhstan |
Technical Training |
1×110MW |
PCF |
2015.07-2016.01 |
Excellent |
68 |
Nagar Coal-fired Power Plant, India |
Technical Training |
2×660MW |
PCF |
2015.04-2015.10 |
Excellent |
69 |
Kailuan Xiexin Power Plant |
Training |
2×300MW |
CFB |
2014.03-2014.09 |
Good |
70 |
Shandong Yankuang Zhaolou Power Plant |
Training |
2×300MW |
CFB |
2013.03-2013.10 |
Good |
71 |
India Chhattisgarh Power Plant |
Translation service |
4×135MW |
CFB |
2011.09-2012.04 |
Excellent |
72 |
OMOTOSHO Power Plant,Nigeria |
Training, operation and maintenance manual compilation |
2×300MW |
Gas turbine(9E) |
2011.07-2012.02 |
Excellent |
73 |
Shandong Yankuang Zhaolou Power Plant |
Training |
2×300MW |
CFB |
2011.02-2011.06 |
Good |
74 |
Panjiang Power Plant |
Training |
2×300MW |
CFB |
2011.02-2012.03 |
Good |
75 |
India Salaya Power Plant |
Training |
2×600MW |
PCF |
2010.12-2011.06 |
Excellent |
76 |
India Mahan Power Plant |
Training |
2×600MW |
PCF |
2010.12-2011.4 |
Excellent |
77 |
Belarus Minsk # 5 Power Station |
Operation & maintenance manuals compilation and on-site revising |
1×399.6MW |
Gas-steam combined cycle(M701F) |
2010.11-2012.12 |
Excellent |
78 |
Fujian Yong’an Power Plant |
On-site Training |
2×300MW |
CFB |
2010.10-2010.11 |
Good |
79 |
Guohua Ningdong Power Plant |
On-site Training |
2×300MW |
CFB |
2010.03-2010.04 |
Good |
80 |
Inner Mongolia Wuhai Power Plant |
Technical Training |
2×135MW |
CFB |
2009.09-2009.11 |
Good |
81 |
Dongfang Electric Co., Indian Generation Project Department |
Training |
2×300MW |
PCF |
2008.12-2009.01 |
Excellent |
82 |
Tangshan Kailuan Oriental Power Co., Ltd. |
Technical Training |
2×150 MW |
CFB |
2007.07-2007.10 |
Good |